Grosskraftwerk Mannheim Block 9 (GKM9)

Operator: Large power plant Mannheim
Kunder: WWV - Heat utilization
Type: Main steam generator
Period: 2010-2013
Services:
  • MD/ND Planning
  • Basic Engineering
  • Detail Engineering
  • Pipe statics
  • 1,300 pipelines
  • Supporting steel construction
  • Pipe statics and structural steel engineering
  • FEM calculation of special components